Restructuring of IT Cadre on the basis of Sanctioned Strength in Zonal Railways/Production Units

Restructuring of IT Cadre on
the basis of Sanctioned Strength in Zonal Railways/Production Units



(भारत सरकार) GOVERNMENT OF INDIA
(रेल मंत्रालय) MINISTRY OF
RAILWAYS
(रेलवे बोर्ड) RAILWAY BOARD
RBA No /2019
No. 2016/AC-II(CC)/37/9
28-03-2019
General Managers
All Zonal Railways and
Production Units (including RDSO)
Sub :- Re-Structuring of IT Cadre in Zonal Railways/Production Units.
Ref:- Board ‘s letter of even No. dated 1 8.04.201 7 (RBA 45/2017).
Further to the instructions issued vide Board ‘s letter ibid, the matter regarding restructuring
of Senior Engineer (IT) and Junior Engineer (IT)’s post of IT Cadre in Zonal Railways/Production Units has again been reviewed in the Ministry of Railways and it has now been decided with the approval of competent authority, that the cadre re-structuring of the post of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre, earlier approved on the basis of operated strength as on l.4.2017 in the ratio of 67:33 respectively, shall now be done on the basis of
Sanctioned Strength of Senior Engineer (IT) and Junior Engineer (IT) w.e.f. 1.4.2017. The entire up-gradation has to
be revenue neutral. Accordingly, the revised sanctioned strength of Senior Engineer (IT) and Junior Engineer (IT) of IT Cadre in Zonal Railways/Production Units as on 1.4.2017 after
restructuring duly taking into account the surrender of JE/ IT posts shall be as under :-

Read also :  7th CPC: Constitution of Committee to examine classification of Railway Posts through RSRP Rules, 2016
S.
No.
Zonal Railway/ Production Unit

Revised Sanctioned Strength after restructuring w.e.f. 1.4.2017
JE/IT SE/IT Total
1
Central Railway
23 50 73
2  Eastern Railway 49 51 100
3 Northern Railway 44 50 94
4 North Easten Railway 20 37 57
5 North East Frontier Railway 8 90 98
6 Southern Railway 20 37 57
7 South Central Railway 13 51 64
8 South Eastern Railway 27 65 92
9 Western Railway 10 33 43
10 North Western Railway 10 18 28
11 West Central Railway 22 22
12 East Coast Railway 3 10 14
13 East Central Railway 1 16 17
14 South Western Railway 8 4 12
15 North Central Railway 16 31 47
16 South East Central Railway 5 37 42
17 Diesel Modernisation Works, Patiala 1 8 9
18 Rail Wheel Factory, Bengaluru 14 14
19 Chittaranjan Locomotive Works 12 31 43
20 Diesel Locomotive, Varanasi 1 31 32
21 Integral Coach Factory 7 40 47
22 Central Organisation for Railway
Electrification
1 1
23 Metro Railway, Kolkata 8 8
24 RDSO, LKO 9 9
25 Rail Coach Factory (KXH) 45 45
Total 278 789 1067
 3. Surrender of Post in JE/IT will be effected before implementing above mentioned cadre restructure orders and the resultant imbalance/variation in the cadre due to surrender of posts of JE/IT shall be reviewed at the time of next annual review of the cadre after implementation of cadre restructuring.

(adsbygoogle = window.adsbygoogle || []).push({});

Read also :  Enhancement of combined Reservation Quota of lower berths for senior citizens and female passengers.

4. Zonal Railways/Production Units may update the book of sanction as per the above sanctioned post w.e.f 1.4.2017..

5. All the other terms and condition mentioned in Board’s letter ibid remain unchanged.
sd/-
(Gaisingam Kabui)
Director Finance/CCA
Railway Board

Click to view/download the PDF
[http://www.indianrailways.gov.in/railwayboard/uploads/directorate/accounts/downloads/Compendium_2019/42%20rba%2022_28032019.pdf]